Nou Mestalla: First piece of roof compression ring installed


23rd February 2026

The first piece of the compression ring of the roof at the Nou Mestalla, which will be the club’s new stadium from the summer of 2027, has now been installed.

Horta Coslada, a leading company in design, manufacturing, engineering and assembly, is responsible for producing these elements, under the instructions of FCC Construcción.

In recent weeks, significant progress has been made in the assembly and installation of the columns, stair towers and the boxes of the structural compression ring, in addition to the arrival of cables for the traction rings (the inner part of the roof’s cable structure) and radial cables (which connect the traction ring with the outer compression ring).

The roof of the Nou Mestalla will weigh 4,800 tonnes and will be supported by 50 S355 steel pillars. In addition, Octopus Energy -the club’s Sustainable Founding Partner- will implement a photovoltaic installation on this roof, made up of solar panels with intelligent system management. As a result, the roof will serve as a ‘lung’ for green energy.

Privacy Overview
MONDO | STADIA

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.